Energy
Waste
Water and Sewage
Transport
Green Blue
Buildings & land use
englishdeutsch
Tool Summary Tool Characteristics Tool Application Source of Tools Opinion of Tools

Tool Characteristics

Name of the tool
Environmental management Control Panel

Data required to utilise tool
The process to set up a management Control Panel consists in 6 stages:
1. To obtain information by identifying the various parties concerned
2. Identifying the most significant aspects of the company´s operations.
3. To define a relevant unit
4. Knowing who collects which data and where to find them
5. To select performance indicators
6. Announcing performances to the various stakeholders.

Form of output
The output takes the form of a variety of performance indicators gathered into the Control Panel that expresses the institution in operation.

Performance indicators are defined in various domains (air, refuse, energy, water, training, transport, etc.) regards to the sector considered (ex: garages/micro-businesses, institutional catering, local authorities, Cultural establishments, etc.)

Examples of performance indicators for Cultural establishments:
• kWh of electricity/seating capacity
• kg of environmentally-friendly paint used for decoration/kg of total paint
• Volume of hazardous goods used/artistic production

Type of data output
Quantitative

What format is the tool available in?
The procedure to establish an Environmental management Control Panel is available on paper and electronic format, but every institution has to develop its own Control Panel.

A brochure explaining the tool is available at: http://www.abece.be/germaine/homee.htm

What language/s is the tool available in?
A brochure explaining the tool is downloadable in French, Dutch and English at: http://www.abece.be/germaine/homee.htm

Characterisation of the tool
Multi-Criteria Assessment tools. Tools to weight different aspect of sustainability (environmental, economic, social), for instance by Multi-Criteria-Analysis, Grids, Matrixes etc.

Factors covered

Environment

Social

Economic

Governance

1

1

Management

Stage when tool is usually used

Inception of idea

Design

Design assessment

Construction

Operation

Demolition

0

0

0

0

1

0