Tool applicationName of the tool Environmental Manual (Environmental impact/aspect register and risk assessment) Who applied the tool in the case? The tool is applied internally. Time taken to fully apply the tool Application of the tool could be achieved in a couple of hours maximum if no mitigation measures are required. Should any mitigation measures be required the time taken will be dependent on the depth of those measures. Any other interesting information about the tool Use of the tool is mandatory within AWG Construction Services Ltd.. Case study/ies where tool is in use Gowerton Outfall |